Quantity: | |
---|---|
TIGA-WLPH1012
Warehouse, Villa, Dormitories, Temporary Offices, Workshop
Customized
25-10000 Sqm
Aluminium Alloy Window or PVC Window
EPS,Rock Wool,PU Sandwich Panel,Color Steel Sheet
10 Floors
High Anti-Fire
Seaworthy Package
China
Sandwich Panel
ISO, CE, BV
ISO9001,ISO14001,Ce
Light Gauge Galvanized Steel
Sliding Door Normal Doors or Electric Rolling Gate
EPS,Rock Wool,PU Sandwich Panel,Color Steel Sheet
We Can Design Drawings According to Your Request
TIGA
100-100, 000 SQM
730890000
Prefabricated house (prefab house) is made of light steel as steel structure and sandwich panels for wall and roof. The insulation of sandwich panel can be polystyrene, polyurethane, rock wool and fiber glass.
Main features:
Dry installation, no construction garbage caused; Environment protective materials adopted, repeated use and low cost; Flexible size and easy to assemble and disassemble with elegant appearance; Safe and durable .It is suitable for temporary buildings such as dormitory, canteen, recreation room, washing room, etc...
Main material of Prefab Houses:
Wall: 50mm/75mm/100mm thick EPS/Rockwool/PU sandwich panel
Roof: 50mm/75mm/100mm thick EPS/Rockwool/PU corrugated sandwich panel
Window: UPVC or Aluminum sliding window
Door: aluminum frame with panel same as wall panel
TECHNICAL PARAMETER: T | |
Wind Load Capaciy: | Grade 11 (wind speed<120 km/h) |
Anti-seismic Performance: | GB50011-2001.GB50017-2003 |
Meet Seismic Forticition Intensity: | Grade 7 |
Sound Insulation Performance: | 40 db |
Snow load capacity of roofing: | 30 kg/m² |
Live load capacity of roofing: | 30 kg/m² |
Wall and Roof heat transmission coefficient: | K=0.414(m2·K/W) |
Wall permitted loading: | 30 kg/m² |
Mezzanine floor load capacity: | 120kg/m² |
Live load of corridor: | 200kg/m² |
Density of EPS: | 12 kg/m3 |
Density of Rockwool: | 80~120 kg/m3 |
Density of PU: | 35~45 kg/m3 |
Delivery time | Normally 20-25 days |
Container loading | 300~320 m² /40'HQ |
1.Q: Could you please design a new and unique drawings according customer 's needs?
A: Absolutely! We are able to provide you with not only construction scheme and structural drawings, but also landscape design! Besides, detailed drawings and 3D models are surely included.One-stop service is our outstanding superiority with no doubt.
2.Q: What should I provide to build a light steel prefab house?
A: So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don't have any. Simply notify us your requirements, such as the area, usage and the storeys of the house.Before long, you'll possess an amazing design.
3.Q: How could I ensure the cost of building a light steel prefab house?
A: Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
4.Q: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, the construction period of is 1 month of a 200-square-meter house by a construction team of 5-6 people. It only costs one week to build the steel structure frame.
5.Q: Is it difficult to build a prefab house?
A: Totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool .What's more ,we can also dispatch workers and engineers according your needs.
6.Q: what are the advantages of light steel prefab house comparing to the traditional building?
A: Better isolation of sound and heat ,Better fireproof and anti-seismic ,Wind resistance ,Time and labour saving , More usable area ,Excellent termite-proof capability.
Prefabricated house (prefab house) is made of light steel as steel structure and sandwich panels for wall and roof. The insulation of sandwich panel can be polystyrene, polyurethane, rock wool and fiber glass.
Main features:
Dry installation, no construction garbage caused; Environment protective materials adopted, repeated use and low cost; Flexible size and easy to assemble and disassemble with elegant appearance; Safe and durable .It is suitable for temporary buildings such as dormitory, canteen, recreation room, washing room, etc...
Main material of Prefab Houses:
Wall: 50mm/75mm/100mm thick EPS/Rockwool/PU sandwich panel
Roof: 50mm/75mm/100mm thick EPS/Rockwool/PU corrugated sandwich panel
Window: UPVC or Aluminum sliding window
Door: aluminum frame with panel same as wall panel
TECHNICAL PARAMETER: T | |
Wind Load Capaciy: | Grade 11 (wind speed<120 km/h) |
Anti-seismic Performance: | GB50011-2001.GB50017-2003 |
Meet Seismic Forticition Intensity: | Grade 7 |
Sound Insulation Performance: | 40 db |
Snow load capacity of roofing: | 30 kg/m² |
Live load capacity of roofing: | 30 kg/m² |
Wall and Roof heat transmission coefficient: | K=0.414(m2·K/W) |
Wall permitted loading: | 30 kg/m² |
Mezzanine floor load capacity: | 120kg/m² |
Live load of corridor: | 200kg/m² |
Density of EPS: | 12 kg/m3 |
Density of Rockwool: | 80~120 kg/m3 |
Density of PU: | 35~45 kg/m3 |
Delivery time | Normally 20-25 days |
Container loading | 300~320 m² /40'HQ |
1.Q: Could you please design a new and unique drawings according customer 's needs?
A: Absolutely! We are able to provide you with not only construction scheme and structural drawings, but also landscape design! Besides, detailed drawings and 3D models are surely included.One-stop service is our outstanding superiority with no doubt.
2.Q: What should I provide to build a light steel prefab house?
A: So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don't have any. Simply notify us your requirements, such as the area, usage and the storeys of the house.Before long, you'll possess an amazing design.
3.Q: How could I ensure the cost of building a light steel prefab house?
A: Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.
4.Q: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, the construction period of is 1 month of a 200-square-meter house by a construction team of 5-6 people. It only costs one week to build the steel structure frame.
5.Q: Is it difficult to build a prefab house?
A: Totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool .What's more ,we can also dispatch workers and engineers according your needs.
6.Q: what are the advantages of light steel prefab house comparing to the traditional building?
A: Better isolation of sound and heat ,Better fireproof and anti-seismic ,Wind resistance ,Time and labour saving , More usable area ,Excellent termite-proof capability.